Alden Tool“Nobody is carrying inventory anymore. So when a customer tells us when they want their job completed, they have to have it when they need it. Which is why working with CONNSTEP was really beneficial. Reorganizing our order-entry process and flow allowed us to significantly improve our on-time delivery which enhances the value we add to our customers.”

– John Killeen, Vice President, Alden Tool

Background

Alden Tool Company specializes in the manufacture of surgical cutting tools, instruments, and components for the orthopedic, spinal, maxillofacial and cranial industries. The company is located in Berlin, Connecticut and has been operating as a family-owned business since 1947.

Alden’s highly skilled machinists utilize the most advanced equipment and technology to produce superior quality surgical instrumentation. Their team works in tandem with the design and manufacturing engineers of customers to ensure expectations are met and to control manufacturing costs.

Multiple medical Original Equipment Manufacturers are served by the company with a focus on excellence throughout all phases of production, quality, and customer service processes.

Situation

On-time delivery is key for any manufacturer and Alden Tool is no exception. To improve its ability to meet its customer delivery obligations, Alden knew they had to trim the time needed to “get the job going.” They were operating at about a 50 percent on-time delivery schedule for a project that typically takes 10 weeks from start to finish.

They were struggling with some orders, especially the repeat ones that might have just a few changes but enough to make it difficult to simply switch gears.

The leadership at Alden Tool recognized their operations were in need of some process improvements. They were aware the organization needed to become more efficient company-wide starting with order-entry.

Alden Tool had previously worked with CONNSTEP, Connecticut’s MEP center, and turned to them again for help in determining what to do to be more efficient when the order gets on the floor.

Solution

CONNSTEP understood the challenge facing Alden Tool and focused on improving their manufacturing scheduling and flow. Training select Alden staff members in Lean manufacturing tools and techniques helped to identify needed improvements.

Given that it was taking too much time to get a job going, job-kitting was recommended by the business growth consultant from CONNSTEP, in the form of a 1-2-3 position rack. Some set-up reduction was also involved in the process.

Since kitting involves the gathering of components and parts needed for the manufacture of a particular product, the Alden team took the time to see what resources and materials were needed to do the job. Individual components were gathered together, as a kit, and issued to the point of use. CONNSTEP also helped Alden Tool to standardize, putting things that need to be done in correct order and in a timely manner.

Results

Alden Tool was committed to improving their on-time delivery for its customers beginning with the efficiency of their order-entry system. Through the adoption of job-kitting, combined with set-up reduction and standardization they’ve registered a 40% improvement in production time.

Their on-time delivery consistently approaches 90%. The implementation of Lean tools and techniques have enabled the organization to do more with less. And maintain the quality standards their customers have come to expect from Alden Tool.

Metrics

  • Increased sales: $100,000
  • Retained sales: $300,000
  • Jobs created: 3
  • Jobs retained: 2
  • Cost savings: $75,000
  • New equipment: $400,000

 

To learn more about achieving results like these, simply fill out the form on the right of this page ~>

CONNSTEP solved a huge problem for us and helped us bring our delivery rate to 100%. As a direct result of that, we have been awarded with an increase in business which, ultimately, will also benefit (our supplier) Har-Conn.”

CT manufacturer Pegaasus

Chris DePentima

CEO, Pegasus Manufacturing Inc.

“I see great value in the new experiences and perspectives CONNSTEP brings to our business, at reasonable prices. They’re not like consultants, they’re like partners in the business – willing to roll up their sleeves and help.”

AGRussell logo

Mark Burzynski

President, Arthur G Russell Co

“CONNSTEP has proved to be a tremendous resource for ESI. CONNSTEP has helped us to adapt to today’s marketplace and remain a quality minded, competitive global player. Our ISO/TS16949 implementation process was efficient and rewarding. I look forward to our future projects with CONNSTEP.”

esi CT manufacturer

Ron Delfini

President, Engineering Specialties Inc.

“CONNSTEP worked with FuelCell Energy to educate and facilitate Lean initiatives and to help meet our needs to establish an overall production improvement plan. This plan has been utilized over a period of time as a ‘guiding light’ to spur numerous improvements that dramatically reduced our product cost.”

Tom Lucas

Manager, Fuel Cell Energy

“CONNSTEP is a valuable partner to Hologic, providing the expertise and ‘outside eyes’ everyone needs to keep their continuous improvement on track. We are now well-positioned on a dynamic growth path and look forward to a long-term relationship with CONNSTEP.”

Greg Safarik

VP Manufacturing Operations, Hologic

“Our experience working with CONNSTEP has brought us benefits we never expected. It’s a great team to work with!”

Bruce Wheeler

VP of Operations, Metal Finishing Technologies Inc.

“The goals of the team were to reduce manufacturing lead-time, reduce floor space utilized, and increase worker productivity. All the goals were met. CONNSTEP helped us to better compete.”

Tornik CT manufacturer

Dan Rubbo

General Manager, Tornik LLC

“The Business Growth Program is working well for us. We enhanced our website following the meetings to improve our SEO and become more visible to search engines. The segment on negotiating …  promoted changes in our thinking and improved how we interact with customers. The mentoring between sessions was helpful in boosting our progress.”

CT manufacturer Colonial Spring

Bill Lathrop

President, Colonial Spring Co.